Fox ESS inverter mounted on a blockwork wall above a stacked Fox battery unit inside an outbuilding; rotary AC isolator and multiple cable glands/terminations are visible — (stage:Open plastic consumer unit recessed in the wall beneath a separate sub‑supply isolator; original row of breakers and a residual current device visible with multiple live, neutral,和After: New 12-zone underfloor heating controller installed, neatly reterminated and tested.Completed internal wiring: Internal control and power wiring completed, terminated and prepared for inspection and functional testing.Exposed conductors: Rodent damage had stripped away the cable insulation, leaving the internal conductors exposed and the circuit unsafe.Completed installation: Completed essential and non-essential distribution boards with containment, local isolation and circuit identification.Completed PV array: Completed roof-mounted solar PV array following final alignment and installation.

Our work

Gallery

Explore a selection of domestic, commercial, industrial and renewable-energy work completed by B2E across Fife and Central Scotland.

1 / 7